Demolition of an entire existing wastewater treatment train & construction of new treatment train to include new BNR Basins, two new secondary clarifiers, a new filter structure, ultraviolet disinfection structure, gravity belt thickener building, sludge dewatering and belt press building, and operations/control building. Also included the addition of two 1250 KW generators and associated electrical improvements via change order.
LEM Construction Co, Inc.
10849 Kinghurst, Suite 150
Houston, TX 77099
P: 281-495-9550
F: 281-495-9995
Email: info@lemconstruction.com
LEM is a Texas based general contracting firm that specializes in the construction of water and wastewater pumpstations and treatment facilities. Our project/field management and support staff is ethical, dedicated, and detail oriented; and all have extensive experience in the water/wastewater treatment construction industry.