Construction of a 1 MGD Sequence Batch Reactor wastewater treatment plant in Rockdale, Texas. Work included a new onsite liftstation (redesigned by LEM for caisson construction), headworks structure, SBR basin and SBR equipment, drying beds, effluent aeration channel, ultraviolet disinfection basin, blower building, operations building, conversion of the existing treatment plant to a digester, and various sitework improvements. Select demolition of existing facilities following commissioning of the new facility.
LEM Construction Co, Inc.
10849 Kinghurst, Suite 150
Houston, TX 77099
P: 281-495-9550
F: 281-495-9995
Email: info@lemconstruction.com
LEM is a Texas based general contracting firm that specializes in the construction of water and wastewater pumpstations and treatment facilities. Our project/field management and support staff is ethical, dedicated, and detail oriented; and all have extensive experience in the water/wastewater treatment construction industry.